Belgium
Beersel, Drogenbos, Linkebeek, Rhode-Saint-Genèse, Uccle
Verrewinkelbeek Collector
Construction of a 6-km long collector
The construction was conducted in three phases:
- the first and second phases during the 90’s,
- the third one in 2018.
The collector transports wastewater from the communes of Beersel, Drogenbos, Linkebeek, Rhode-Saint-Genèse and Uccle to the South Brussels Wastewater Treatment Plant.
Our mission(s)
- Preliminary design
- Detailed design
- Execution plans
- Works supervision
- Start-up assistance