Cameroon
Warak
Bini Hydroelectric Power Plant in Warak
Construction of a 75 MW (603 hm³) hydroelectric development in Warak, on the Bini river
The completion of this hydroelectric development goes hand in hand with the construction of a 225 Kv high voltage electricity transmission line with a length of 70 km to the Mounguel substation.
This work requires the displacement of 300 people for whom a Travel and Relocation Plan has been implemented, in accordance with the requirements of the World Bank.
Our mission(s)
Project Owner Support (AMO)