Complete studies of the wastewater treatment plant building

Construction and commissioning of the wastewater treatment plant at Sprimont.

The treatment plant has a processing capacity of 5.900 PE.

Description :

  • Treated pollution load: carbon, nitrogen.
  • Treatment process: low-lead activated sludge, denitrification by alternating phases, sludge dewatering by centrifugation.

Treatment lines: 1 pre-treatment line, 1 line of biological treatment, 1 line of treatment sludge.

The project management mission includes the following studies:

  • Preliminary studies and preliminary design: sizing of the water plant, estimation of the investment cost and the operating costs …
  • Making out of the specifications: the administrative part, the technical part (civil engineering and electromechanical engineering), the specific technical part and the appendices.
  • Offers analysis and drawing up of the analysis report.
  • Management of the works: control of the schedule, check of the civil engineering and electromechanical documentation, check of the good execution of the works, control and approval of the financial aspects.

Client

Association Intercommunale pour le Démergement et l’Epuration (AIDE)

Project Dates

2009 – 2016