Complete studies of the wastewater treatment plant building

Construction and commissioning of the wastewater treatment plant in Ittre.

The treatment plant has a processing capacity of 5.600 equivalent PE.

Description :

  • Treated pollution load: carbon, nitrogen.
  • Treatment process: low-load activated sludge, denitrification by alternating phase, sludge dewatering by centrifugation;
  • Line treatment: a pre-treatment line, a line of biological treatment and a line of treatment sludge.

The project management mission includes the following studies:

  • Preliminary studies and preliminary design: sizing of the water plant, estimation of the investment cost and the operating costs …
  • Making out of the specifications: the administrative part, the technical part (civil engineering and electromechanical engineering), the specific technical part and the appendices.
  • Offers analysis and drawing up of the analysis report.
  • Management of the works: control of the schedule, check of the civil engineering and electromechanical documentation, check of the good execution of the works, control and approval of the financial aspects.

Client

Intercommunale du Brabant Wallon (IBW)

Project Dates

2006 – 2012