Technical assistance services for the supervision of the construction works of a new underpass for handling vehicles at the new airfield of Málaga Airport

The works referred to in this contract involved the construction of a tunnel intended for handling vehicles under the southern link taxiway that connects the former runway with the new one (runway 12-30, parallel taxiway, accesses to the runway and new apron).

Initially, handling vehicles were meant to traverse the southern link taxiway on the ground level, but after an air navigation study, it was determined that the best solution was to construct a tunnel that will allow handling vehicles to pass from the eastern platform to the northern one.

It is a 150 m tunnel with two underpass approaches. The total length of the construction is 560 m. The tunnel has two 5.50 m lanes, with 0.50 m hard shoulders on each side, a 0.75 m right sidewalk and a left sidewalk with a variable length ranging from 1.25 to 2.50 m.

Client

AENA (Spanish Airports Authority)

Project Dates

2009 – 2010

Partners

Eptisa / Inteinco / Vorsevi: 75%

Project Figures

Contract Value:
392,308.06 €