Liège, Saint-Vith and Spa

Conducting technical audits of 30 building in the interquartier 10 of the Belgian Army. These audits had the aim of granting a certain number of energy improvement initiatives in the existing building.

The audit included the study of:

  • the roof insulation;
  • the insulation of the shell of the buildings;
  • the HVAC electrotechnical installations;
  • the industrial application electrotechnical installations (e.g. compressor, etc.);
  • the re-engineering of external lighting;
  • the installation of domestic hot water solar panels.

Client

Belgische leger

Project Dates

2010