Control and supervision of the construction works: new Malaga West Ring Road. Section: MA-417 Access – Highway A-357 (Guadalhorce Highway). Section length: 3.9 km. Province of Malaga

Highway A-357, which connects Malaga Technology Park to Cártama, is the main road link to villages such as Álora or Pizarra that access the highway by the road A-343. The Regional Government of Andalusia planned to continue doubling Highway A-357 on the section between Casapalma and Zalea. The total amount of works reached € 105,912,426.17.

The project involved the construction of 7 structures, including an 800-m viaduct over Guadalhorce River and a 600-m viaduct over the Cordoba – Malaga high speed railway line. Besides, works also covered an access to road A-7052 and the future connection to Malaga Airport North Access.

The services provided included: quality control of works and materials; control and supervision of the construction works, materials and construction methods; land survey and Bill of Quantities; schedule and budget control; monitoring the implementation of health and safety measures and invoicing control.

Client

Dirección General de Carreteras (Directorate General for Roads). Ministerio de Fomento (Ministry of Development)

Project Dates

2007 – 2012

Partners

GEOCONTROL 20% APPLUS NORCONTROL, S.L.U. 40%

Project Figures

Contract Value:
4,316,830 USD