In order to clean up the Thyle river and its effluents (the Gentilsart, the Abreuron, the Pêcherée, the Ry Dreumont, …), TPF-Utilities has been entrusted with the studies and construction management of the Villers-la-Ville collector and the connected pumping stations.

This collector will eventually bring all the wastewater to the wastewater treatment center of Villers-la-Ville.

Special techniques have been developed in the collectors at the town center in order not to damage the housing and not to disturb traffic : boring, secant piles…

The project management mission includes the following studies:

  • Preliminary studies and preliminary design: sizing of the pipes, estimation of the investment cost and the operating costs …
  • Making out of the specifications: the administrative part, the technical part (civil engineering and electromechanical engineering), the specific technical part and the appendices.
  • Offers analysis and drawing up of the analysis report.
  • Management of the works: control of the schedule, check of the civil engineering and electromechanical documentation, check of the good execution of the works, control and approval of the financial aspects.

Client

Intercommunale du Brabant Wallon (IBW)

Project Dates

2004 – 2013