PAYMACOTAS - Detailed design of the wastewater and rainwater treatment networks and road project in Souq El Gomma District, Tripoli

The project involved the design of new wastewater and rainwater treatment networks and paving of the streets in Souq El Gomma District (Tripoli), with an approximate area of 1,200 Ha.

The sanitation system consists of a network that separates rain and fecal substances for an area of 1,216 Ha.

Client

Construtora Andrade Gutierrez S.A. (Libyan Branch Office)

Project Dates

2009 – 2010

Project Figures

Contract Value:
520,000.00 €