The Thumaide incinerator has increased its processing capacity with the installation of new furnaces. By taking advantage of these works and in order to comply with environmental requirements, the chloride content in the waste water needed to be reduced.

The technical solution selected was to treat the untreated water with reverse osmosis.

The project designer assignment awarded to TPF-Utilities includes the following design projects:

  • Preliminary studies and draft designs including: technical and financial study with comparison of different scenarios.
  • Drafting the specifications, that is to say, the administrative terms and conditions, general terms and conditions, special terms and conditions and the related appendices (tender documentation, estimate to be completed, etc.)
  • Analysis of tenderers’ bids and drafting the award report.
  • Management of works, including: planning follow-up, FT verification, checking the proper execution of works, progress approval and final statement, etc.

Client

Intercommunale de Propreté Publique du Hainaut Occidental (IPALLE)

Project Dates

2009 – 2010