Modification of the rainwater drainage system and installation of two storm drains. Evaluation of the water quality before discharge with the aim of checking for any possible pollution.

TPF-Utilities conducted:

  • Audit of the drainage system.
  • Basic design of modifications.
  • The specifications
  • Analysis of offers
  • Management of works.
  • The Health and Safety coordination.

Client

Chimac

Project Dates

2009 – 2010