The project aims to add 4 km to the Regional Interior Ring’s length

Studies and projects of the geometry of the layout, earthwork, drainage, paving, ancillary works, signaling, safety equipment, works of art, integrated surveillance and management systems of tunnels and landscape integration; the total length of the current section is 4.0 km (approx.), 1.7 km of which develops into tunnel. Includes the reformulation of interchanges of Buraca (IC19) and Pontinha (IC16), partially in use and links with Damaia, Portas de Benfica, Benfica roundabout and replacement of affected roads to ensure the restoration of urban road network and provide access to the surrounding areas.

Client

EP-ESTRADAS DE PORTUGAL

Project Dates

2011

Partners

GEG, VIATUNEL