Preparation of Detailed Projet Report (DPR) as per latest guidelines for Rural RoadProjects (including bridges, cross drainage structures) Under PMGSY in formerly West and South Tripura

Consultancy services for preliminary and detailed Engineering including preparation of DPR for construction of 17 permanent bridges at various locations on the State Road Network have been entrusted to CETEST by the Executive Engineer, Agartala Division No III PWD(R&B). The scope included topographical survey taking adequate L-Sections and X-Sections, preparation of PPR indicating type of bridge, conducting geotechnical investigation, design of bridge, preparation of detailed drawing and BOQ and finally submission and assisting in getting approval  of DPR and preparation of working drawings.

Client

PWD (R&B), Agartala

Project Dates

2011 – 2012