Operation and maintenance with full guarantee over a five year period of the technical installations of the Leopold sports center in Ghent.

  • Regular maintenance of the swimming pool water treatment and filtration installations
  • Chemical products management
  • Swimming pool water control and analysis
  • Sourness measure
  • Maintenance of the following technical installations are included in the contract :
    • The boilers
    • The sand filters
    • The ventilation installations
    • The lights
    • The sanitary facilities
    • The sauna
    • The massage bath

Client

Tussengemeentelijke Maatschappij der Vlaanderen voor Watervoorziening (TMVW)

Project Dates

2010 – 2015