New metro line between North Station and Bordet

The underground tunnel of about 5 km length will include 8 new stations and will be realized at great depth (+ 35 m) following the large diameter (15 m) Tunnel Boring Machine (TBM) application which will reduce the potential nuisance to the local population during the works.

The study will be carried out in several phases.

The project carried out by the joint venture BMN (Bureau Métro Nord) is composed of TPF Engineering-Grontmij- W.M. Van Campenhout/Arep et Amberg (CH)

Within the consortium, TPFE will be responsible for the assignments in the field of structural and civil engineering, and the building services of the stations.

Client

Federal Public Service Mobility and Transport

Project Dates

Realization date: 2026

Project Figures

Length: 5 km