Turnkey contract including design, supply, supervision of erection and starting-up of a butane-propane separation plant, consisting of :

  • A 160 T/h separation column – 19 bar abs
  • Two pre-heating exchangers
  • A top aerocondenser
  • Two bottom exchangers
  • One balloon and two vertical reflux motor pumps
  • Pipes, fittings, insulation
  • Instrumentation, electricity and control equipment