Our mission was focused on the construction of a bypass road in Jodoigne. The project is divided into three phases. The first phase concerns a connecting road (8 m wide and ± 780 m long) with a parallel cycle track (3 m wide)

Our mission was focused on the construction of a bypass road in Jodoigne. The project is divided into three phases. The first phase concerns a connecting road (8 m wide and ± 780 m long) with a parallel cycle track (3 m wide) The project comprises :

  • the study of two roundabouts , one at the rue de la Maladrerie Street and the other at the Chaussée de Charleroi
  • the study of the bridge on the Grande Gette
  • the study of the rain water network

TPF Engineering (formerly Louis Engineering) has been entrusted with :

  • the coordination services for health and safety
  • the topographical land surveys
  • the program for geotechnical testing
  • the hydrographical and hydrological surveys and dimensioning of the structures
  • the bills of quantities and drawings of the different structures
  • the requested file for the planning permit
  • the estimated bills of quantities for each road section
  • the preparation of the tender documents (bills of quantities, technical specifications and drawings)

Client

Service Public de Wallonie, DG1, D143 (Public Service of Wallonia)

Project Dates

Studies started in 2010
Works foreseen in 2015

Project Figures

Amount of works taxes not incl.:
+/- 1,600,000 €