Complying with the determination of the Environmental Basic Plan of the São Francisco River Integration Project, construction projects of water supply infrastructure were developed for the affected communities of the aforementioned project

This contract has the goal of the development of construction projects of water supply infrastructure of the directly affected communities by the São Fransisco River Integration Project, complying with the determination imposed by the environmental installation license of this project through the Environmental Basic Plan of the construction works. Thus, the waters of the São Francisco River, a very important water resource for the northeast of Brazil, were exploited for the Northeast Hydrographic Basin, benefiting with treated water more than 300 communities that are distributed across 4 states of the Northeast Region of Brazil. In the scope of this project, diagnostics of the current situation of these 300 communities were developed as well as of the water supply systems currently operating. Moreover, the construction project of the catchment, adduction, reservation and distribution of water.

Client

DNOCS

Project Dates

12/2013 – 05/2015

Project Figures

Contract value : 3,937,974.77 €