Completed study

This project comprises the installation and hydraulic and electrical integration of a combined heat and power generation unit close to the existing boiler room on the CERIA campus. This project includes:

  • Drafting special technical specifications
  • Analysis of tenderers’ bids and drafting the award report.
  • Assistance in the realisation of the project, site monitoring.

Client

Commission Communautaire Française (COCOF)

Project Dates

2013 – 2015