Independent Engineer for the BOT work of Securitization of Toll at Five Mumbai Entry Points in Mumbai with maintenance of Flyovers and Allied Structures on : Eastern Express Highway Corridor, Western Express Highway Corridor, Lal Bahadur Shastri Marg Corridor, Airoli Bridge Corridor, Sion Panvel Corridor

Providing services for the following Five Mumbai Entry Points Corridors names as below:

  1. Sion-Panvel Corridor, Length 25 Km, 5+5 Lane, NH-4
  2. Eastern Express Highway Corridor, Length 23.55 Km, 3+3 Lane, NH-3
  3. Lal Bahadur Shastri Marg Corridor, Length 21 Km, 4 Lane
  4. Airoli Bridge Corridor, 3+3 Lane, Length 3811.00 m
  5. Western Express Highway Corridor, Length 25.33 Km, 8-10 Lane, NH-8
Sr. No. Item Eastern Express Highway Corridor Western Express Highway Corridor Lal Bahadur Shastri Marg Corridor Airoli Bridge Corridor Sion Panvel Corridor
1. Flyovers

9

7

3

7

2. Pedestrians Subways / Vehicular Subway

2

2

1

3. R.U.B. at Suman Nagar

1

4. Toll Plaza

1

1

1 1

1

5. Junctions

4

6. Railway Over Bridge

1

7.

Bridge

1

TOTAL

13

14 5 2

9

Total Length of structures 23.727 Km

Description of actual services provided by your staff within the assignment:

Special Technical Specification:

  • Automization of Toll Plaza using system of Electronic Toll Collection (ETC)
  • Landscaping and Beautification of Junction, Flyovers and Toll Plazas
  • Safety and Traffic Management Operations, Road Safety Audit
  • Securitization of Toll at Five Mumbai Entry Points in Mumbai
  • Modernization and Computerization of the Toll Plazas
  • 5 Nos of Augmentation of Toll Plaza

Scope of Services:

  • Supervision for all routine maintenance and repairs activities
  •  Supervision of maintenance of existing flyovers and structures
  •  Supervision of Traffic Management
  •  Periodical inspection of damages and getting repairs done
  •  Designing and preparing special repairs scheme
  •  Supervise the Structural Audit of all structures carried out by the Concessionaire and giving advice to MSRDC.
  •  Review, Monitor and approved the Modernization and Computerization of the Toll Plazas including Electrical Installation of Computerization for issuing receipts and collecting the data in Central locations with LAN and Supervise during the Implementation of Toll system.
  • Supervision of Traffic Survey carried out by MSRDC

Client

Maharashtra State Road Development Corporation Limited

Project Dates

2012-2015