Houselhod waste incineration plant (6.5 ton per hour) with flue gas treatment and electrical power production.

The existing furnace has been replaced by a modern one (featuring a water cooled grid).  The plant mainly consists of a furnace with its feeding system, a steam boiler, a turbo generator and a steam condensing system.

Turnkey contract, to design and implement :

  • Process and equipment engineering.
  • Buildings, roads and networks.
  • Supply, erection and commissioning of the furnace (feeding system, furnace and peripherals, scales and fines collection and disposal, combustion control system, utilities, …)

Client

I.B.W. (Intercommunale du Brabant Wallon)

Partners

FABRICOM GTI / ALB