The center of the Pierre Harmignie educational community is composed of three buildings, each one owning its own boiler room. The study focuses on energy audit of the boiler as well as on the opportunities for replacement of the boilers by centralized network which would be efficient technically and economically.

TPF-Utilities study includes :

  • The audit of the heating network.
  • The study of the replacement of boilers by an equivalent solution.
  • The study of a centralized cogeneration.
  • The study of a centralized biomass boiler.
  • The energetic and economic analysis of the solutions.

Client

Communauté Educative Pierre Harmignie A.S.B.L.

Project Dates

2012 – 2013