The contract covers the management and optimisation of the swimming pool water treatment of the Noordzeebad swimming pool in Blankenberge.

The swimming pool is a salt water pool and is supplied by a sea water pumping plant.

Both the large and small pools have their own filter system, circulation pumps, heat exchanger and dosing systems for both chlorine and acid.

There are about 80,000 visitors annually.

The contract includes the maintenance and management (including interventions) and the optimisation of technical systems for the swimming pool water treatment:

  • Rinsing the filter systems
  • Management of the chemicals
  • Monitoring and analysis of the bathing water

Client

Farys|TMVW

Project Dates

2015 – 2020