The construction of the Expressway S-2 section Konotopa-Puławska together with the construction bond with MPL Okecie and Marynarska street (S-79) in Warsaw is the bigger investment task and relates to the construction of the transit of A2 Poznan-Lodz-Warszawa-Biala Podlaska motorway through Warsaw.

The middle part of the S-2 expressway together with S-79 assure direct access to the International Warsaw Airport. Project includes building of two sections of a 6-lane (2 roads with 3 lanes each) express-way S2 and S79, four interchanges, building of many engineering objects such as bridges, viaducts, foot bridges, road and rail tunnels. Construction of the S-2 section Konotopa – Płuawska junction with a section of Airport Junction – Marynarska (S-79)  contribute to the objectives of the external environment of the project as: increasing traveling comfort, streamline passing through Warsaw areas, improving the conditions and availability of land. By increasing the quality and grade of roads it contribute to the economic development of businesses and residents of the region under consideration way. This project increases also the capacity of the road network in Warsaw and as a result it contributes to the time savings of users of the network and to reducing the number of accidents as well as toxic exhaust.

Client

GDDKiA Warszawa

Project Dates

2010 – 2013

Project Figures

Project costs: ca 233.9 MEUR (tax excl.)