Preparation of Feasibility and Detailed Project Report for 3 National Highways in the state of Assam

PWD (Assam) had appointed CETEST as a consultant to prepare Detailed Project Report for 3 National Highways (namely NH127B, NH127C and NH315) having total length of 150km. The roads are to be upgraded / developed to 2-lane with paved shoulder standard. The newly declared NH-127B starts from Srirampur on NH-27 and ends near Dhubri at chainage 55.700 km. and  NH-127C starts from Samthaibari in the state of Assam and ends in Galengphu (Indo-Bhutan Border). The newly declared NH-315A starts from Tinsukia moving via Deosal, Tingrai-Chariali, Sasoni, Naharkatia, Joypur & connecting Hukanjuri at Assam Arunachal Pradesh Border. The consultancy Fees for the project was 30 million Rupees.

Client

Public Works Department-NH Division-Assam

 

Project Dates

2016