Detailed design and technical surveys for the concession of Highway CV-50, which includes the construction, maintenance and operation of the road section: Benaguasil North Bypass – Highway A-3. Section length: 21.6 km.

During the design phase, the services provided to the concessionary company involved: land survey and cartography (1:1000 scale), final design of the alignment, study of materials, geotechnical investigation of slopes and structures, pavement, drainage, affected utilities, structures, environmental protection measures, road safety, traffic signing, road marking and land acquisition.

Besides, the contract included the conduction of a series of studies on the evolution of the pavement during the concession period, in order to determine different alternatives to upgrade its capacity in the future.

Due to its technical complexity, it is important to highlight the study and design of the connection with Highway A-3 and the viaduct over Turia River, with a total length of 240 m.

Client

DRAGADOS (Construction Company)

Project Dates

2008 – 2009

Partners

Contract Value: 1,104,230 USD