Implementation of the cooling network and process water conditioning at a stainless steel plant.

Design, supply, erection and commissioning of :

  • 5 pumping stations located across the plant for cooling water infeed.
  • Water analysis and treatment (additives dosing equipment).
  • Demineralised and decarbonated water production unit drawing water from the Sambre river.
  • Motor power for ditto (6.6 KV / 0.5 KV sub-station, MCC cubicle, …)
  • Siemens PLC automation system and WinCC supervision.
  • Instrumentation.
  • Civil works for the main pumping unit, for the cooling towers and for equipment inside the building (lighting – HVAC – fire detection and fire fighting equipment, …).

Client

ARCELOR

Partners

TPF UTILITIES (assuming its post-erection operation)