GETINSA - Consulting and assistance services for the supervision of the works for the new high speed railway access to Levante. Madrid – Castilla-La Mancha – Valencian Community – Region of Murcia. Section: Aranjuez – Ontígola. Section length: 4.7 km

The route, which is 4.70 m long, runs between the provinces of Madrid and Toledo and includes the following structures:

  • Viaduct over Las Salinas Stream, 266 m long.
  • El Regajal Tunnel, 2,437 m long. The tunnel central section (2,080 m long) will be excavated in mine in accordance with the Environmental Impact Assessment, which entails no damages to El Regajal – Mar de Ontígola Nature Reserve.
  • 2 artificial tunnels, 0.34 km long.
  • 2 overpasses.

The detailed design, which consists in a double-track high speed line with international gauge, includes all the works required for the execution of the railway line, such as earthworks, drainage works, structures and tunnels, relocation of affected utilities and accesses to ensure line connections.

Client

ADIF (Spanish Railway Authority)

Project Dates

2007 – 2011

Project Figures

Contract Value: 4,073,405 €