Consulting and assistance services to the projects management and coordination of: “Navarra Plan 2012: Priority Action: Cantabrian – Mediterranean High Speed Corridor. Section: Castejón – Comarca de Pamplona”. Section length: 71 km.

Total length: 71 km, with 1,876 m of viaduct and 6,099 m of tunnel. It also includes two Train Overtaking and Parking Posts and a Pooling Post along the route.

Cross-section: double-track line, with standard gauge, except for:

  • Tafalla – Campanas Section
  • Campanas – Esquiroz Section

TPF Getinsa Euroestudios (formerly Getinsa) provided coordination and supervision services for the projects to be designed by the consultants awarded the different sections of Castejón – Comarca de Pamplona line.

Technical assistance services have a double purpose: on the one hand, apart from the technical team, there are different key experts, who will perform supervision tasks and revision of all matters related to their fields of expertise that are included in the final designs. On the other hand, TPF Getinsa Euroestudios will carry out the supplementary works described in the Terms of Reference that may be required during the construction (land survey, delineation, typing) as well as preparation of brochures, boards, drawings, etc.

Client

Departamento de Obras Públicas, Transportes y Comunicaciones (Department of Public Works, Transport and Communications). Government of Navarre

Project Dates

2009 – 2013

Project Figures

Contract Value: 774,000 €