Supervision services for the construction of a bus only lane in Highway C-58, between Nus de Ripollet and Meridiana Avenue.

The project consisted in the construction of a 6.85 km lane for the exclusive use of buses and high-occupancy vehicles to facilitate access to Barcelona through Highway C-58, one of the busiest highways in the area.

  • Total length of the lane: 6,850 m
  • Arched support structures: 530 m
  • New decks: 8 units
  • Expanded decks: 16 units
  • In-situ walls: 2,315 m2
  • Precast walls: 2,750 m2
  • Reinforced earth walls: 669 m2
  • Steel viaduct: 890 m
  • Longitudinal drainage: 9,000 m
  • Waterworks: 11 units
  • Slope retaining: 17,900 m2
  • Concrete safety barrier: 51,000 m
  • Precast concrete impost: 6,100 m
  • Excavations: 429,100 m3
  • Variable message board: 22 units
  • Coated macadam: 90,800 tones
  • Concrete: 30,350 m3
  • Asphalt concrete: 3,100 tones
  • Concrete and stabilized soil: 66,300 m3
  • Formwork: 47,400 m3

Client

Túneles y Accesos de Barcelona SAC

Project Dates

2008 – 2012

Partners

CICSA (50%)

Project Figures

Contract Value:
2,738,296.00 €