Reservoir with storage volume of 33.3 hm³, intended for urban supply and irrigation of an agricultural area.

Dam: rockfill with a concrete curtain in the upstream face; volume of landfill: 0.44 hm³; maximum height of the dam: 47 m; development and width of the crown: 224 m and 10 m;

Flood spillway: spillway type labyrinth, deployed on the left bank, with 25 m of development, restitution channel with 176 m and energy dissipation in ski jumping (Qdim = 181.5 m³/s).

Client

Direction Generale des Barrages et des Grands Travaux Hydrauliques

Project Dates

2015

Partners

UNI CONSEILS, LISCONCEBE