The contract encompasses the preparation of the Environmental Impact Study and Implementation of the Project of irrigation infrastructure, drainage and road associated with the improvement of about 8010 ha for irrigation and is part of Irrigation Global System of the Multi-purpose Development of Alqueva.

It integrates the following partial projects:

  • Primary Adductor (gravity circuit 8.4 km in total length);
  • Reservoir Estácio (for modelling in the field; useful storage volume is 119 592 m³);
  • Pumping station of Estácio (1 step pumping; raising a maximum flow of 4.8 m³/s);
  • Conduct lift between the pumping station and the Estácio R1 reservoir (about 827 meters in length);
  • Reservoir R1 (in reinforced concrete, the total volume of the reservoir 2415.7 m³);
  • Secondary Irrigation Network (101.4 km in length);
  • Road Network (improvement of 3 roads and construction of three new, in a total length of 21 km);
  • Drainage Network (interventions in 21 water lines with a total length of 57.3 km).

Client

EDIA – Empresa de Desenvolvimento e Infraestruturas do Alqueva, SA

Project Dates

2010 – 2011

Partners

COBA – Consultores de Engenharia e Ambiente, S.A.